archive team group, computing team, computing team group, domain admins, domain users, email, livestream technicians, vision mixer (obs)
390
edits
Tom.cheyney (talk | contribs) (Brackets) |
mNo edit summary |
||
(5 intermediate revisions by 4 users not shown) | |||
Line 36: | Line 36: | ||
[http://www.jlab.org/Hall-D/Documents/manuals/APC%20stuff/AP9630%209631%20UPS%20Network%20Management%20Card%202%20User's%20Guide%20firmware%20V5.1.1.pdf Network Card Manual] | [http://www.jlab.org/Hall-D/Documents/manuals/APC%20stuff/AP9630%209631%20UPS%20Network%20Management%20Card%202%20User's%20Guide%20firmware%20V5.1.1.pdf Network Card Manual] | ||
[[ | <div style="clear: both"></div> | ||
==Initial Setup== | |||
[[File:Serial_hack.jpg|thumb|right|300px|The hack used to interface with derrick]] | |||
To use derrick we first had to gain access to it. The network interface requires a username and password which were set by the previous owner. To reset them we had to interface via serial over a 2.5mm jack (shown right) into the network card. The process is as follows, | |||
* Press reset | |||
* Wait for the network lights to flicker | |||
* Press reset again | |||
* Press enter in terminal until a login prompt appears | |||
* Use login apc, apc | |||
==Service History== | |||
The original batteries finally gave up in September 2015, a fresh set (RBC 24) were ordered and fitted a week later. Tip - you can reuse the battery tray, you only need order the actual lead acid batteries (x4). | |||
== Current location == | |||
As of 2019 Derrick is still functional and is in the server rack as it's UPS. Maintenance is expected to be required within the next year or a replacement will have to be found. As part of the computing update 2019 / 2020 Derrick may be replaced when the server stack is altered and replaced with VMs. At time of writing, the 2019 /2020 computing update hasn't happened yet and so Derrick's fate is unknown. | |||
[[Category:Servers]] | [[Category:Servers]] |
edits