OB:Woodstock 2010

From YSTV Documentation Wiki

Woodstock 2010 will be in Vanbrugh as usual. Currently the suggestion is to to focus all our efforts on the main stage, with maybe a wide shot or something on the indoor stage.

Main Stage

  • Someone needs to contact the organisers well before the event to tell them we NEED POWER for cameras!!!!
  • 2 HD's
    • as roaming
  • 1 HD as dollycam
    • only if space between crowd barrier & tent is adequet.
    • haggle if necessary, but woodstock will be packed, and they shall be of higher importance to us - our job is to make the pictures a success, given available space.
  • 1 Howard.
    • flown from rig
    • bring cable ties, lots of cable ties
  • Miranda (sky)
    • as wide
    • on balcony per usual
  • canon on balcony?
    • may need to bring OB lighting rig for presenters.
  • power from event
    • bring the 16a > 1a's distro board
  • projector
    • just feed it composite

Indoor Stage

  • Probably just a wide shot.
  • not many crew, so focus on main
  • Take event sound
  • Use to cut between act on main stage
  • Cams at back sides
  • Tom Trolley Rig

Roomspace

  • Woodstock have 'pretty much booked out all of Vanburgh's upstairs' for us & URY (from friday onwards)
  • URY are in V120 (the SCR) -- V/120 is not the SCR, it's another small seminar room next to V/122. Usually URY are in the SCR though. (Nick)


Commercial stuff

  • Needs to happen
  • let people knowits happening
  • DVD's?

VT's

  • Back archive of stuff to play if there's a pause - e.g. "now lets watch 2007"
  • On a per song basis, with some full sets - no-one can tell for definate how long a changeover will be!
  • All Vt's to be used must be put into a 16:9 project, with black bars down sides
    • This means they get squished, and unsquished, rather than just unsquished (stretchy stretchy)
    • Thus maintaining a respectable aspect ratio...

Streamage

  • Both stages
    • Use new strm0
    • Use an Edit PC

Presenting and stuff

  • head of organisation - Viv.C
  • some notes about bands
  • will provide continuity between acts & links to VT's
  • Max changeover MS - 20mins
  • V random between 0-10 on IS
  • Get bands in

Comms

  • give to presenters not cam Ops - cam ops can be clever
  • Clever signalling solution needed.


Gazebo

  • Stick on balcony - for rains
  • Backup = go inside.

Edit PC

  • for top'n'tailing

Denton Boom

  • Bring to keep Balmer happy

YUSU Plasma's

  • Cullen to talk to yusu IT GUYS. be very very persuassive.
  • Chislett talk projectors YSL.