OB:Children in Need 2012: Difference between revisions

m
image gallery
m (add image)
m (image gallery)
Line 19: Line 19:
== Aftermath ==
== Aftermath ==
The de-rig (which wasn't full, as all control room-side equipment and the presenter set boards were kept for imminent future use) was done in record time due to a high number of crew remaining behind. The entire society was out of the building and locked up by 23:30! The live show was all capture to edit 1 straight out of the DAs and placed in Pending Edits ready for on-demand editing.
The de-rig (which wasn't full, as all control room-side equipment and the presenter set boards were kept for imminent future use) was done in record time due to a high number of crew remaining behind. The entire society was out of the building and locked up by 23:30! The live show was all capture to edit 1 straight out of the DAs and placed in Pending Edits ready for on-demand editing.
<gallery>
File:CiN 2012 1 Set.jpg
File:CiN 2012 2 Set wide.jpg
File:CiN 2012 3 Director Producer.jpg
File:CiN 2012 4 Crew.jpg
</gallery>


[[Category:Shows]]
[[Category:Shows]]
[[Category:Children in Need]]
[[Category:Children in Need]]
Administrators, DnsAdmins, Domain Admins, Domain Users, confluence-administrators, confluence-users, crowd-administrators, jira-administrators, jira-developers, jira-users, stash-administrators, stash-users
322

edits