Allen and Heath ZED 428: Difference between revisions

m (Software correction)
Line 26: Line 26:


== Known Faults ==
== Known Faults ==
 
=== Past issues ===
The LR button on channel 25-26 causes some noise issues on the main LR channels. The entire of the channel seems to be mixed to the right regardless of inputs or pan setting. The two issues may be related.
*The LR button on channel 25-26 caused some noise issues on the main LR channels. The entire of the channel seems to be mixed to the right regardless of inputs or pan setting. As the desk was under warranty, it was shipped off to a repair center in Germany. Channel now works fine, but has slightly brighter mute LED than the others.
 
*Group 4 failed during [[hist:Battle of the Bands 2014|BoB 2014]]. As the desk was ''just'' still under warranty, it has once again been shipped to Germany for repairs.
As the desk is one of the few things YSTV still has under warranty, it's been shipped off to a repair center in Germany. The [[Eurorack MX2642A|OB desk]] is being used for studio shows for the time being.


== Notes ==
== Notes ==
camera trained, confluence-administrators, confluence-users, coshh trained, crowd-administrators, directors, domain admins, domain users, jira-administrators, jira-developers, jira-users, lighting trained, stash-administrators, stash-users, webdev
184

edits