Allen and Heath ZED 428: Difference between revisions

m
LR issues
m (LR issues)
Line 26: Line 26:


== Known Faults ==
== Known Faults ==
*The left channel is ~12dB quieter than the Right channel. Currently thought to have occurred at or shortly after BoB 2015, or possibly during the replacement of the Right channel.
=== Past issues ===
=== Past issues ===
*The LR button on channel 25-26 caused some noise issues on the main LR channels. The entire of the channel seems to be mixed to the right regardless of inputs or pan setting. As the desk was under warranty, it was shipped off to a repair center in Germany. Channel now works fine, but has slightly brighter mute LED than the others.
*The LR button on channel 25-26 caused some noise issues on the main LR channels. The entire of the channel seems to be mixed to the right regardless of inputs or pan setting. As the desk was under warranty, it was shipped off to a repair center in Germany. Channel now works fine, but has slightly brighter mute LED than the others.
*Group 4 failed during [[hist:Battle of the Bands 2014|BoB 2014]]. As the desk was ''just'' still under warranty, it has once again been shipped to Germany for repairs.
*Group 4 failed during [[hist:Battle of the Bands 2014|BoB 2014]]. As the desk was ''just'' still under warranty, it has once again been shipped to Germany for repairs.
*The Right channel failed during [[hist:Battle of the Bands 2015|BoB 2015]], with a replacement board being purchased and fitted just before Easter 2015.


== Notes ==
== Notes ==
camera trained, confluence-users, coshh trained, crowd-administrators, domain admins, domain users, jira-administrators, jira-developers, jira-users, ladder trained, lighting trained, stash-users, webdev
392

edits