Monitor Rack: Difference between revisions

m
no edit summary
m (→‎Usage: Temp until rejig)
mNo edit summary
 
(7 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{HDunsure}}
{{HDOK}}
[[File:Monitor Rack.JPG|400px|right|thumb|The monitor rack as of 15/05/2013. The YSTV logo is showing on the commonly used monitors]]
[[File:Monitor Rack.JPG|400px|right|thumb|The monitor rack as of 11/11/2013. HEY FIX THIS NEED A NEW PHOTO]]
This is where we place all the monitors to allow us to see what's happening at different parts of the vision path.  
This is where we place all the monitors to allow us to see what's happening at different parts of the vision path. Mainly it contains the large multiview screen for the vision mixer and the director.  


== Power ==
== Power ==
Line 9: Line 9:
== Signal ==
== Signal ==


The signal cables are ended with BNC connectors and numbered from 1 to 18. The numbering starts from the top left of the rack, and goes left to right, top to bottom with 18 being bottom right. The inputs for these are located in the patch bay.
The monitors are connected to the OB unit currently being used in the studio via a COAX cable to a distribution panel near the unit behind the sound station which is converted from HDMI by a [[Blackmagic Micro Converters|converter]].


== Usage ==
The [[Computing:Stream Encode Server|Stream]] monitor is fed directly via HDMI from a capture card in the server rack.


The current usage is:
5 - [[Hedco]]
6 - [[Computing:Video Server|Vidsrv]]
7 - Post-[[CORIOgen Eclipse|GFX]]
8 - Pre-GFX (DaVE Prog Out)
9-12 - DaVE inputs
15 - Prog (Post-GFX)
17 - Prev
[[Category:Technical]]
[[Category:Vision Path]]
[[Category:Vision Path]]
archive team group, computing team, computing team group, domain admins, domain users, email, livestream technicians, vision mixer (obs)
390

edits