Monitor Rack: Difference between revisions

m
no edit summary
mNo edit summary
 
(13 intermediate revisions by 4 users not shown)
Line 1: Line 1:
It's where we hide the pictures. No-one ever notices :P
{{HDOK}}
[[File:Monitor Rack.JPG|400px|right|thumb|The monitor rack as of 11/11/2013. HEY FIX THIS NEED A NEW PHOTO]]
This is where we place all the monitors to allow us to see what's happening at different parts of the vision path. Mainly it contains the large multiview screen for the vision mixer and the director.  


==Allocation system==
== Power ==
{|border="1"
|-
!1
!2
!3
!4
!5
!6
|-
!7
!8
!9
!10
!11
!12
|-
!13
!14
!15
!16
!17
!18
|}


*19 & 20 are brought out to the left of the rack.
The monitor rack is fed power from circuits 1 and 2 in the control room. Circuit 1 powers the left side, while 2 does the right.


==Current allocations==
== Signal ==
{|border="1"
 
|-
The monitors are connected to the OB unit currently being used in the studio via a COAX cable to a distribution panel near the unit behind the sound station which is converted from HDMI by a [[Blackmagic Micro Converters|converter]].
!Vt out
 
!Vidserv out
The [[Computing:Stream Encode Server|Stream]] monitor is fed directly via HDMI from a capture card in the server rack.
!Mux 1 Out
 
!Mux 2 Out
[[Category:Vision Path]]
!Mux 3 Out
!Mux 4 Out
|-
!DaVE 1
!DaVE 2
!DaVE 3
!DaVE 4
!Processor 1
!Processor 2
|-
!Graphics out
!Dave Program
!.
!DaVE Preview
!Recorders input
!Net output
|}
archive team group, computing team, computing team group, domain admins, domain users, email, livestream technicians, vision mixer (obs)
390

edits