camera trained, confluence-users, coshh trained, crowd-administrators, domain admins, domain users, jira-administrators, jira-developers, jira-users, ladder trained, lighting trained, stash-users, webdev
392
edits
No edit summary |
mNo edit summary |
||
Line 3: | Line 3: | ||
== Patch Bay == | == Patch Bay == | ||
[[File:Patch bay.JPG|thumb| | [[File:Patch bay.JPG|thumb|left|150px|The patch bay]] | ||
This is where all the patch boxes and a few cables feed to. This is due to the majority of patches needing to get to the vision or computing rack. With the exception of box 4, all the connectors are grouped according to their type (BNC, XLR, etc). The patches are then arranged in number order within this grouping. | This is where all the patch boxes and a few cables feed to. This is due to the majority of patches needing to get to the vision or computing rack. With the exception of box 4, all the connectors are grouped according to their type (BNC, XLR, etc). The patches are then arranged in number order within this grouping. | ||
Line 15: | Line 15: | ||
=== Box 5 === | === Box 5 === | ||
[[File:Patch_box_5.jpg|thumb|150px| | [[File:Patch_box_5.jpg|thumb|150px|left|Patch box 5 (Studio, next to the tech room.) Note the missing connectors]] | ||
This box is located by the tech room in the studio. Apart from missing two BNC (51, 52) XLR male (54, 55) connectors and a slightly different panel it is identical to Boxes 6-9. | This box is located by the tech room in the studio. Apart from missing two BNC (51, 52) XLR male (54, 55) connectors and a slightly different panel it is identical to Boxes 6-9. | ||
The missing BNC and XLR connectors actually go through to the tech room and arrive on long cables hanging in one conrner | The missing BNC and XLR connectors actually go through to the tech room and arrive on long cables hanging in one conrner |